Handling The Concrete
SITE EXCAVATION The first subcontractor on a construction site is the excavator. His job is an important one. Proper footings depend on his ability to remove the soil to an accurate depth and to disturb the subgrade as little as possible. All footing subgrades should be thoroughly compacted whether fill is used or not. Too …